OPAC Consulting Engineers

Segmental Bridges


OPAC Segmental Bridges (8 Total, 3 on this page)


Shenzhen Western Corridor Bridge - Design Supervision

Shenzhen Western Corridor Bridge

Design supervision and review for a 3.8 km long bridge between Shenzhen and the Hong Kong SAR, with separate 210 m span asymmetrical single-tower cable-stayed units across two navigation channels, and 75 m span concrete box girder viaducts.

Shenzhen, China. Construction completed 2005

View details


Maysville Bridge - Design Support, Design Services During Construction

Maysville Bridge

Design and design services during construction for a 1,050 ft span cable-stayed bridge across the Ohio River. The 60 ft wide deck consists of steel edge girders supporting a composite precast panel deck.

Ohio River, Maysville, Kentucky - Aberdeen, Ohio. Construction completed 2000

View details


Koror - Babeldaob Bridge - Collapse Investigation

Koror - Babeldaob Bridge

Collapse investigation of a post-tensioned concrete box girder bridge in Micronesia built by segmental construction.

Republic of Palau, Micronesia. Investigation completed 1998

View details